What is project cargo?

Project cargo is cargo delivered for a specific project: a new plant, a production upgrade, an infrastructure build. Project logistics makes sure every package arrives when installation needs it, often out of gauge and from several suppliers.

Published:

In plain words

Standard freight moves one consignment from A to B. Project logistics is a supply programme driven by the project schedule: installation starts on a given day, and everything required must be on site by then.

How it differs from standard freight

  • Many packages and suppliers instead of one shipment.
  • Tied to the installation or construction schedule, not the cargo ready date.
  • Frequent out-of-gauge and heavy pieces.
  • Several modes of transport and transfers.
  • One party accountable for the whole programme.

Typical project cargo

  • Equipment for plants and production lines.
  • Power equipment: generators, transformers, turbines.
  • Steel structures and modules.
  • Equipment packages for infrastructure sites.

Stages

  • Collecting specifications and building the delivery plan.
  • Choosing routes and modes for each group of packages.
  • Preparation: packing, lashing, permits, documents.
  • Monitored transport through every transfer.
  • Customs clearance.
  • Delivery to site and unloading in line with installation.